Table of contents Show Hide
The background
An 18-storey office tower with 42-meter floor plates. Facade daylight reached only the first 12 meters; core corridors and meeting rooms ran artificial lighting all day, every day.
The solution
We installed 96 matrix daylight panels on the roof and east facade, routed quartz fiber through the ceiling service layer, and placed 128 diffuser endpoints across corridors, meeting rooms and open plan areas.
- Up to 98% daylight utilization, with meaningful output even on overcast days
- Fiber routed around ducts and cable trays — zero structural changes
- Hybrid endpoints top up with LED when needed and report to the BMS
The result
- 62% reduction in core-hours lighting energy
- Average task illuminance up from 180 lx to 460 lx during daylight hours
- “Light comfort” satisfaction score up 41% in the staff survey