The background
A single-storey machine hall of 32,000 m²: deep floor plates, dense equipment, lighting running around the clock — over a million RMB in annual lighting electricity, with flicker and glare affecting precision work.
The solution
- 420 matrix daylight panels installed in batches on the metal roof, loads verified by structural calculation
- Quartz fiber run along the bottom chords of the trusses, delivering even natural light at working height
- Zone daylight sensors with automatic LED blending
The result
- 480 MWh of lighting electricity saved per year — 58% of the original load
- Daytime illuminance uniformity above 0.7, no flicker, no glare
- Production never stopped: six zones, rolling installation